PDA

View Full Version : Zimbra Success Stories



Pages : [1] 2

  1. my two cents
  2. What is better!?
  3. Smooth install of Zimbra in Ubuntu 6.10 (Edgy Eft)
  4. 4.5 NE Upgrade Experience :-)
  5. FYI: Upgrade success to Zimbra 4.5 OpenSource on Ubuntu
  6. We've been running Zimbra Open Source for two months with no problem!
  7. One Big Thank you to all
  8. Something must be HORRIBLY wrong
  9. Upgrade (4.5.4 to 4.5.5)
  10. Using Zimbra for a year now...
  11. Zimbra rocks
  12. Thank you all
  13. Thanks Zimbra!
  14. Thank you Zimbra! [I really mean it!]
  15. squirrelmail to zimbra 4.51
  16. Thank You Zimbra, Mmorse & Phoenix!
  17. I'll have to add one to the fire here....
  18. Running Zimbra on Gentoo
  19. Running Zimbra on CentOS 4.5 under Xen (Gentoo Host)
  20. Thank you, Zimbra! Up and running on Debian Sarge
  21. rpath - nfs
  22. Installed on CentOS 5 success, thanks
  23. Tell me your experience!
  24. Gentoo Installation under VMWare
  25. Ldap
  26. Another BIG thank you!
  27. Zimbra and Thunderbird/Lightening
  28. Success Upgrade Zimbra 5.4.3 to 5.4.6. Simplemente Grandioso
  29. I love it!
  30. Great job zimbra
  31. No More Novell
  32. Its Great
  33. Nice Job Zimbra Team!
  34. Red Hat Clustering
  35. Great System
  36. Above and Beyond...
  37. MS's Secret Infatuation
  38. The Defection is over .. Zimbra I am back
  39. Nice job
  40. Long way from FOSS to NE
  41. thanks team zimbra!!
  42. Zimbra and Joomla Project
  43. Hosting 5.0.2 and very happy :)
  44. Completed Etch 4.2, Zimbra 4.5.7 - 5.0.2 and ZERO problems
  45. 5.0.1 -> 5.0.2 and life is good
  46. JHolder - Thanks on a successful server move!
  47. Server Down: Saved by mmorse
  48. Zimbra garners broad applause
  49. From 3.1 to 5.0.2 – my Zimbra success story
  50. Awesome Product
  51. Upgraded from 4.5.10 to 5.0.2 - No issues!
  52. Upgraded from zcs-4.5.2 OSS to 5.0.4 Network - No issues!
  53. some feedback
  54. My successful Zimbra install
  55. Upgrade from 4.5.6 NE to 5.0.4 - Smooth
  56. 5.0.4 > 5.0.5
  57. Get Pidgin working with Zimbra
  58. Upgrade 5.0.4 to 5.0.5
  59. Ubuntu 8.04 (VM Machine) w/ ZCS-5.0.5_GA_2201
  60. Spotted! Zimbra at Revision3
  61. success upgrading 5.0.2 > 5.0.5
  62. 5.05 on Ubuntu 6.06.2
  63. Zimbra 5.0.5
  64. Zcs 5.05 --> Zcs 5.06
  65. Exchange 2003, Win2k3 R2 -> Zimbra 5.0.5 on Ubuntu 8.04 Migration
  66. Installed 5.0.6 Network Edition on Debian Etch
  67. Zimbra is Cooooool
  68. Verizon/LG enV2 plus Zimbra
  69. Joint Venture
  70. Zcs 5.0.6 => Zcs 5.0.7
  71. Upgrade to 5.0.7
  72. Zimbra on the eee pc 900
  73. Notifications on 5.0.7 - audible/sound on incoming mail
  74. Upgrade NE Professional 5.0.5 to 5.0.7
  75. 5.0.6 FOSS to 5.0.8 FOSS Ubuntu
  76. 5.0.6 NE to 5.0.8 NE
  77. Sharing.
  78. OS X Server Mail to Zimbra 5.0.7
  79. 5.0.4 NE to 5.0.8 NE = No Problem!
  80. Can Zimbra Do This For Me?
  81. Zimbra Party
  82. Zimbra Mobile rocks
  83. Zimbra beats other guys' standard for uptime
  84. 5.0.8 -> 5.0.9
  85. success cases of the ZCS
  86. Upgraded 4.5.9 to 5.0.9 NE
  87. FC7 5.0.4_GA upgrade to 5.0.9_GA = Good
  88. Happy Belated Birthday to my Zimbra Servers
  89. Etch AMD64: 5.06-->5.10 pretty easily
  90. 22,500!
  91. 49,700 account deployment
  92. Can/Does Zimbra rehost email?
  93. Silky smooth.
  94. One year since last downtime.....
  95. 5.0.1 FOSS to 5.0.12 FOSS on Debian Etch
  96. 5.0.4 FOSS to 5.0.13 FOSS to 5.0.13 NE
  97. 650,000 Mailbox Migration Qmail-LDAP 2 Zimbra NE
  98. 5.0.7 Foss --> 5.0.13 Foss
  99. Zimbra praised by ZDNET article: Top alternatives to Microsoft Outlook
  100. Zimbra Course, something for me?
  101. Upgrade from 5.0.10GA -> 5.0.14GA
  102. Praise for Zimbra
  103. Upgrade from 5.0.14 to 5.0.16
  104. [SOLVED] 32-bit to 64-bit upgrade - problem SOLVED
  105. Upgrade from 5.013 to 5.0.16
  106. 5.0.8 -> 5.0.11 in 30 minutes
  107. Upgrade 5.0.11 to 5.0.16
  108. Server replaced - Ubuntu 6.06 32bit 5.0.16 NE > Redhat 5.3 64bit 5.0.16
  109. Just have to say, Thank you.
  110. CNET review of netbooks mentions Zimbra
  111. German speaking Zimbra group on Xing.
  112. Restoring zcs ce to new os install from tgz backup - my experience
  113. Upgrade 5.014 to 5.018 Ubuntu 6.06 LTS
  114. Upgrade 5.014 to 5.018 Debian 4.0
  115. Upgrade ZCS 5.0.16 to 5.0.18 RHEL 5 64bit x86 NE
  116. Upgrade ZCS 5.0.13 to 5.0.18 CentOS 64bit x86 NE
  117. Almost live!
  118. Upgrade from 5.016 to 5.0.18_GA_3011.RHEL5_64 on Centos 5.3
  119. Upgrade 5.0.16 to 5.0.18 on Ubuntu 8.04LTS
  120. Everything running smooth...
  121. Upgrade from 5.0.18_GA_3011.RHEL5_64 on Centos 5.3 to Zimbra 6.0.0_GA_1802.RHEL5_64
  122. 5.0.18_ga_3011.debian4.0 -> 6.0.0_ga_1802_debian4.0
  123. [SOLVED] upgrade from RHEL4 32bit 5.0.18 NE to 6.0.0
  124. Upgrade from ZCS NE 5.0.18 to ZCS NE 6.0.0 GA on RHEL 5.3 64bit with ZCB 5.0.18
  125. Upgrade Success - 5.0.16 to 6.0 CentOS5
  126. Good Upgrade from ZCS NE 5.0.18 to ZCS NE 6.0.0 GA on RHEL 5.3 64bit
  127. good upgrade from RHEL4 32bit 6.0.0 NE to 6.0.1 NE
  128. 6.0.1 success
  129. Upgrade from 6.0 to_GA 6.01_GA Suceesfull
  130. Move from 5.0.16 Fodora 32 bits. ==> 5.016 Ubuntu 64 bits.
  131. Migration 5.0.16 NE Ubuntu 8.04 to Virtual RHEL 5.3
  132. Apart from a few issues...
  133. Upgrade From 6.0.1 to 6.0.2
  134. 6.0 to 6.0.2 successful
  135. Update using Zimbra OSS
  136. Since we at voicelogic.com started using Zimbra,
  137. Upgrade from 5.0.19 to 6.0.2
  138. Another 5.0.19 to 6.0.2 Success
  139. 6.0.1 to 6.0.2 upgrade
  140. Upgraded to Zimbra 6.0.2_GA_1912 Successfully
  141. Upgrade 5.0.19 NE to 5.0.20 NE RHEL5_64
  142. 5.0.18 to 6.0.2 on Ubuntu 8.04
  143. Upgrade from 5.0.16_OS to 5.0.16_NE...
  144. Successfully upgrade from zcs-NE-6.0.2 to zcs-NETWORK-6.0.3 on RHEL4 32bit
  145. Successfully Upgraded 6.0.2 to 6.0.3 on Centos 5.3 64bit
  146. Upgrade of Zimbra NE 5.0.20 to 6.0.3
  147. Successful upgrade from 5.0.19 to 6.0.3
  148. Upgrade 6.0.2 to 6.0.3
  149. From 6.02 to 6.03
  150. Upgraded 6.0.3 to 6.0.4 successfully
  151. 6.0.2 to 6.0.4 on Ubuntu 8.0.4
  152. 6.03 to 6.04 CentOS
  153. 6.0.3 to 6.0.4 Ubuntu8 FOSS
  154. Succesful Upgrade: Upgrading from 5.0.18 to 6.0.4 on Ubuntu8.04 32BIT running in VBox
  155. Upgrade 5.0.11 to 6.0.4 success
  156. Upgrade from 5.0.14 to 6.0.4 on CentOS
  157. Upgrade from 6.0.4 to 6.0.5
  158. Upgrade from NE 6.0.3 to NE 6.0.5
  159. Upgraded from 6.0.4 to 6.0.5 on Centos 5 Successfully
  160. Successfull Installation on SLES 11 64 bit+Zimbra 6.0.5 FOSS Edition
  161. 6.0.4 - 6.0.5
  162. 5.0.21 to 6.0.5 MultiServer Upgrade with 6000 Users
  163. Upgrade 5.0.21 to 6.0.5 on CentOS 5.4 x64
  164. Successful update from 6.0.3 to 6.0.5 NE CentOS x64
  165. Migration Mac OS 10.5 (ZCS 6.05 - 32bit) -> Ubuntu 8.04LTS (ZCS 6.05 - 64bit)
  166. 5.0.19 to 6.0.5 Multinode upgrade
  167. 5.0.11 to 6.0.5 upgrade (more-or-less) successful
  168. Upgrade from 4.5.11 to 6.0.4
  169. new ZCS update
  170. Zimbra Improves Efficiency
  171. 6.0.5 -> 6.0.6 upgrade
  172. 6.0.5 -> 6.0.6
  173. 5.0.13 NE to 5.0.23 NE
  174. 6.0.5 -> 6.0.6
  175. 6.04 -> 6.06 Multiserver upgrade
  176. 5.0.13 to 6.0.6.1 NE RHEL5x64 success
  177. Successfully Upgraded 6.0.5 to 6.0.6 on Centos 5 64bit with Patch 1
  178. Implantation de Zimbra chez RE/MAX Québec inc.
  179. zimbra stories
  180. Congratulations to the zimbra team are in order
  181. Successfully Upgrading 6.0.6.1 > 6.0.7 on SLES 11 SP 1 64 bit
  182. NE 6.06 -> 6.07 on Redhat 5.4 = Easy and Works
  183. 6.0.6.1 Foss -> 6.0.7 Foss on CentOS 5.5 64bit
  184. Successful Ubuntu 8.04 x64 upgrade from 6.04 NE -> 6.07 NE
  185. Successful upgrade from 6.0.6 to 6.0.7 on Centos 5 64bit
  186. Successful upgrade from 6.0.6 -> 6.0.7
  187. 6.0.6 NE -> 6.0.7 NE RHEL 5 64-bit
  188. Upgraded 6.0.7 on Ubuntu 8.04 to 6.0.8 on Ubuntu 10.04
  189. Successful upgrade from 6.0.7 NE to 6.0.8 NE on CentOS 5 64bit
  190. ZCS NE 6.0.7 -> 6.0.8 RHEL 5 64-bit
  191. Successful upgrade from 6.0.7 to 6.0.8 on Centos 5 64bit
  192. Sucessfully Installed Zimbra OpenSouce Edition
  193. Successful Upgrade from 5.0.23 to 6.0.8
  194. Migration from solaris 8 cyrus+horde to Ubuntu 8.04 Zimbra Comm 6.06
  195. Successful upgrade from 6.0.8 to 6.0.9 on Centos 5 64bit
  196. 6.0.8 P3 -> 6.0.9 RHEL Linux 64 bit
  197. Successful upgrade from 6.0.6 to 6.0.9 on Centos 5 64bit
  198. ZCS FOSS 6.0.9 to ZCS network edition 6.0.9.
  199. Success: ZCS 6.0.8 (64bit) on Ubuntu 8.04LTS
  200. Successful upgrade from 6.0.9 to 6.0.10 on Centos 5 64bit
  201. Successful upgrade
  202. Success: 6.0.9 to 6.0.10 on RHEL 5 64-bit
  203. Successful upgrade from 6.0.9 to 6.0.10 on Ubuntu 8.04 64bit
  204. Success upgrade from 6.0.10 to 7.0 Ubuntu 10.04
  205. Successful Test Upgrade from 6.0.10 to 7.0.0
  206. Successful upgrade from 6.0.9 to 7 on Centos 4 64bi
  207. Sucessfully Move to another server at Same time upgrade to 7
  208. [SOLVED] Successful Upgrade but need a fix before proceed
  209. Zimbra Failures
  210. Migrate and upgrade Zimbra 6 32 to Zimbra 6 64bit then to 7
  211. Successful upgrade to Zimbra 7 form 6.0.10
  212. Successful upgrade from 5.0.22 to 6.0.10 on Ubuntu 8.04
  213. Successful Exchange 2003 -> ZCS 7.0 migration
  214. 6.0.10->6.0.11->6.0.12
  215. 6.0.10 -> 7.0.1 (Centos5.5_x64) Nice n' easy
  216. ZCS 6.11 RHEL 5 x32 -> ZCS 6.11 RHEL 5 x64 -> ZCS 7 -> ZCS 7.0.1
  217. Upgrade from 6.0.10 to 7.0.1
  218. Successful upgrade from 6.0.10 to 7.0.1 on Ubuntu 8.04 x64
  219. Success: 6.0.8 -> 7.0.1 on Ubuntu 8.04 64 Bit
  220. ZCS 6.0.10 to ZCS 7.0.1 RHEL5 32-bit
  221. 6.0.2_GA to 7.x?
  222. Centos 64bit 6.10 -> 7.0.1 (imapproxy)
  223. Ubunutu 8.04x64 6.10 -> 7.01 Multiserver
  224. upgrade from 6.0.12 -> 7.1.0
  225. 7.0.1 -> 7.1.0 CentOS5.5_x64 Smooth upgrade
  226. Ubuntu 8.04 x64 6.0.8 to 7.1 Success
  227. Upgrade Ubuntu 6.06 Zimbra 5.0.19 to Ubuntu 10.04 Zimbra 7.1.0
  228. Success: 6.0.8 -> 7.1.0 Ubuntu x64
  229. Success: 7.0.1 FOSS to 7.0.1 NE (Ubuntu 8.04)
  230. Success Moving Zimbra NE 7.1.0 RHEL4 to RHEL5
  231. Success: 6.0.10 -> 7.1.1 Ubuntu 8 x64
  232. 6.0.10 > 7.1.1 with fix
  233. ZCS 7.1.1 on Ubuntu 10.04LTS 64 bit
  234. Zimbra Hosting Farm Migration Completed
  235. Down with MS SMALL BIZ
  236. Centos 5 - Zimbra 7.01 -> 7.11 -> U1 Story.
  237. successful migration to 64bit
  238. Migration from 5.0.6_GA_2313 dapper 32bits -> 6.0.13_GA_2918 hardy 64 bits
  239. 6.0.12 to 7.1.1 on Ubuntu 8.04
  240. 7.1.1 > 7.1.2
  241. 7.1.0 -> 7.1.2 CentOS5 x64
  242. 6.0.12 > 7.1.2 Documents-to-Briefcase Failed
  243. Successful upgrade to 7.1.2
  244. Ubuntu 8.04 x64 7.1.0 to 7.1.2 Success
  245. Successful Upgrade
  246. successfull upgrade 7.0.0 -> 7.1.3
  247. Successful upgrade from 7.1.2 to 7.1.3
  248. Zimbra 6.0.9 32bit to 7.1.2 64bit Success
  249. Success: 7.0.1 NE to 7.1.3 NE
  250. Successful Upgrade from 7.1.2 to 7.1.3