Results 1 to 6 of 6

Thread: Calendar Dates are wrong (Mac OSX)

  1. #1
    Join Date
    Jun 2008
    Posts
    4
    Rep Power
    7

    Default Calendar Dates are wrong (Mac OSX)

    I use the Zimbra Desktop to keep my calendar and the rendering for November 2008 is off by one day. It shows November 2nd twice (both Sunday and Monday) and that pushes the rest of the days in the month off by one day... which means all the events scheduled are off by one day.

    As far as I can tell this only happens on my calendar on Nov 2nd 2008.

    Screenshot attached.

  2. #2
    Join Date
    Jun 2008
    Posts
    4
    Rep Power
    7

    Default Additional Info

    The calendar view is fine when you switch to "Week" view and it is correct when you are in month view and viewing any other month (other than Nov.)

    The issue does NOT show up in the webmail interface for Zimbra 5.0.10 GA

  3. #3
    phoenix is offline Zimbra Consultant & Moderator
    Join Date
    Sep 2005
    Location
    Vannes, France
    Posts
    23,587
    Rep Power
    58

  4. #4
    Join Date
    Nov 2008
    Posts
    5
    Rep Power
    7

    Default

    Exactly the same for me as the original posting (mac OSX)

    I had a look at the bug fix link which says fixed

    So how do i get it fixed on my system

  5. #5
    phoenix is offline Zimbra Consultant & Moderator
    Join Date
    Sep 2005
    Location
    Vannes, France
    Posts
    23,587
    Rep Power
    58

    Default

    Quote Originally Posted by waynerrr View Post
    So how do i get it fixed on my system
    You upgrade your Zimbra server to 5.0.11, that's where the fix is.
    Regards


    Bill


    Acompli: A new adventure for Co-Founder KevinH.

  6. #6
    Join Date
    Nov 2008
    Posts
    5
    Rep Power
    7

    Default

    I tried for half an to try to work out what i have to do??

    I couldn't make "head or tail" what an earth that i was supposed to do

    I switched to zimbra from thunderbird 2 months ago. I had used thunderbird for 12 months but it had the habit of messing up data out of the blue (say every 4 months)

    However, This is the 4th issue i've had with the zimbra product

    The more that i use the product the more i find very basic things wrong with it.

    And i find the support really poor.

    I'm going to abondon zimbra for the moment and try Scalix: Linux Email, Calendaring and Messaging Platform instead

Similar Threads

  1. Changing Calendar Organizer script
    By snsparrish in forum Administrators
    Replies: 4
    Last Post: 05-02-2011, 05:41 AM
  2. Wrong dates in Zimbra Webmail
    By voltcraft in forum Migration
    Replies: 11
    Last Post: 06-08-2009, 04:12 AM
  3. Schedule View displays events in wrong calendar
    By jdell in forum Administrators
    Replies: 11
    Last Post: 01-28-2008, 07:17 PM
  4. Calendar always has wrong time
    By Doug_M in forum Administrators
    Replies: 25
    Last Post: 10-09-2006, 07:59 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •