Results 1 to 3 of 3

Thread: Upgrade multiple server

  1. #1
    Join Date
    Feb 2007
    Posts
    4
    Rep Power
    8

    Default Upgrade multiple server

    Hi

    What is the exact steps to upgrade a multi server installation ?

    How can I upgrade without stopping services ?

    Thank you

  2. #2
    Join Date
    May 2006
    Location
    USA
    Posts
    6,242
    Rep Power
    21

    Default

    Welcome to the forums,
    What version are you currently running? (zmcontrol -v)

    OS Release notes: NE Release Notes.pdf
    NE Release notes OS Release Notes.pdf

    Multi-Server Environment Upgrade Steps:

    Before you begin, you should stop all the servers in your ZCS non-production
    environment. On each server, at zimbra, type zmcontrol stop.
    Important: Upgrade the servers in the following order: LDAP server, mail store server, and then MTA server.

    Log in as root to the Zimbra server and cd to the directory where the 4.5.6 tar file is saved (cd /var/tmp).
    Type the following commands:
    tar xzvf zcs.tgz, to unpack the file
    cd [zcsdirectoryname], to change to the correct directory
    ./install.sh, to begin the upgrade installation

    Note: If you have a large number of accounts, include nohup on the ./
    install.sh command line. (nohup ./install.sh) so that the session does not time out before the configuration has been upgraded.

    Do you wish to upgrade? [Y] is displayed, press Enter to continue.
    The upgrade packages are unpacked.
    The packages you want to install on the server should be marked Y. All other packages should be marked N.
    The system will be modified. Continue? is displayed, type Y and pess Enter.
    The upgrade process verifies which version of ZCS is being run and proceeds to upgrade/the older packages are removed.
    Config is restored.
    Automatic restart of processes
    The upgrade is complete.
    Continue to upgrade each server.

    Important: After you upgrade all servers, you should run a full backup immediately. Schema changes in this release invalidates all old backups.

    Note: If your users are affected by the 2007 time zone changes, you should run the time zone migration tool.
    Last edited by mmorse; 07-24-2007 at 01:41 PM.

  3. #3
    Join Date
    Feb 2007
    Posts
    4
    Rep Power
    8

    Default Sorry few informations

    My version is 4.5.1 on RHEL 4

    2 mta, 1 ldap, 2 store

    I know how to upgrade a single server and all server step
    by step (ldap first, then store then mta) but I'd like
    to know if there is a way to allow a user on server A receive and sen email
    while I upgrade the server B, do I have to use a cluster ? how ?

    Thanks

Similar Threads

  1. initializing ldap...FAILED(256)ERROR
    By manjunath in forum Installation
    Replies: 39
    Last Post: 06-07-2013, 10:27 AM
  2. Zimbra fails after working for 2 weeks
    By Linsys in forum Administrators
    Replies: 10
    Last Post: 10-07-2008, 12:42 AM
  3. Server rename and multi-server upgrade.
    By Tim Mothery in forum Administrators
    Replies: 0
    Last Post: 07-21-2007, 06:20 AM
  4. need advice on configuring zimbra to work with fax server
    By pheonix1t in forum Administrators
    Replies: 0
    Last Post: 07-11-2007, 07:46 PM
  5. Error 256 on Installation
    By RuinExplorer in forum Installation
    Replies: 5
    Last Post: 10-19-2006, 09:19 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •