    Hi all,

    Is there any other way to migrate calendars from one zimbra server to another than using curl? I've got a few here that are kicking out this error:


    The server encountered an
    internal error () that prevented it from fulfilling this request.</u></p><p><b>exception</b> <pre>java.lang.NullPointerException
    javax.mail.internet.MimeUtility.checkAscii(MimeUti lity.java:1266)
    javax.mail.internet.MimeUtility.encodeWord(MimeUti lity.java:595)
    javax.mail.internet.MimeUtility.encodeText(MimeUti lity.java:426)
    javax.mail.internet.MimeMessage.setSubject(MimeMes sage.java:775)
    com.zimbra.cs.mailbox.calendar.CalendarMailSender. createCalendarMessage(CalendarMailSender.java:360)
    com.zimbra.cs.mailbox.calendar.CalendarMailSender. createCalendarMessage(CalendarMailSender.java:314)
    com.zimbra.cs.mailbox.Mailbox.addInvite(Mailbox.ja va:2980)
    com.zimbra.cs.service.formatter.IcsFormatter.saveC allback(IcsFormatter.java:134)
    com.zimbra.cs.service.formatter.Formatter$SaveOper ation.callback(Formatter.java:273)
    com.zimbra.cs.operation.Operation.schedule(Operati on.java:190)
    com.zimbra.cs.service.formatter.Formatter.save(For matter.java:103)
    com.zimbra.cs.service.UserServlet.doPost(UserServl et.java:438)
    javax.servlet.http.HttpServlet.service(HttpServlet .java:709)
    com.zimbra.cs.servlet.ZimbraServlet.service(Zimbra Servlet.java:162)
    javax.servlet.http.HttpServlet.service(HttpServlet .java:802)

    The full stack trace of the root cause is available in the Apache Tomcat/5.5.15 logs.


    Digging through the logs doesn't come up with much.

    Any thoughts, anyone? I've got some way-around-back ways of doing this (like using the PST Import tool), but I'm aiming for best practices here.

    Thanks!

  2. #2
    Join Date
    Sep 2005
    Posts
    57
    Rep Power
    10

    Default

    Hi, it looks like you're hitting this bug:

    Bug 13781 - NPE while subscribing to a remote Japanese ics

    This is fixed in ZCS 4.5.1. What version are you on?

    Look at your ics file and see if there are any VEVENTs that have empty SUMMARY value or are missing it. Set SUMMARY to something to workaround the bug.
    Bugzilla - Wiki - Downloads - Before posting... Search!

  3. #3
    Join Date
    Nov 2006
    Posts
    12
    Rep Power
    9

    Default

    We were on 4.5.0, but upgraded to 4.5.6 last night.

    It appears that the SUMMARY=EMPTY is a problem with some of the entries. Fixing it enabled the import to succeed.

    We've also noticed that every instance of ATTENDEE;CN needs to be replaced with ATTENDEE;RSVP=FALSE, as these are entries where the user hasn't RSVP'd to an appointment yet, and Zimbra doesn't seem to like these on the import without specifying the RSVP status.

    Not sure if that's a bug that was noticed and fixed already, though.

    Cheers!

Similar Threads

  1. Outlook/Zimbra Private Appointments Issue
    By Smurthey in forum Zimbra Connector for Outlook
    Replies: 0
    Last Post: 03-09-2007, 07:29 AM
  2. Issues with Outlook Calendar Migration - ics
    By soxfan in forum Migration
    Replies: 2
    Last Post: 02-28-2007, 06:50 PM
  3. Replies: 2
    Last Post: 02-26-2007, 11:37 AM
  4. Calendar Item that is Read Only
    By phingers in forum Developers
    Replies: 6
    Last Post: 02-18-2007, 10:45 PM
  5. Exchange 5.5 Migration - Calendar Problem
    By wbsimonato in forum Migration
    Replies: 3
    Last Post: 12-04-2006, 05:33 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •